Provided below is a site plan of the project area.  The project area consists of the area within the dashed lines.  Three contractors have been selected to construct this project, with responsibilities as follows:

bullet

Contractor #1 (SJL Construction) will be installing a gravity sewer line.

bullet

Contractor #2 (Johansen, Inc.) will be installing a gravity sewer line from the dividing line (see map below) to the Main Street Pump Station at Salt Mine Road and Highway 260, and will also be installing a 12" forced main from McCracken Road and Highway 260 at the Verde District Ranger Station to the Wastewater Treatment Plant (being constructed by Contractor #3) on the north side of Highway 260. 

bullet

Contractor #3 (Fann Environmental) will be constructing the Wastewater Treatment Plant Expansion. 

Since the gravity sewer lines are a major component of this project, that area has been divided (see red line in graphic below) to delineate which contractor is responsible for which portion of the gravity sewer line project portion of the overall project. 

 